The purpose of the project is to efficiently meet the Kingdom’s refined product demands in Makkah Province. A new pipeline system (YNJ-1 & YNJ-2) with ultimate capacity of 577 MBD (240 MBD & 337 MBD respectively) is planned to deliver products from the proposed Yanbu’ Distribution Hub to the existing and expanded North Jeddah Bulk Plant facility.
The pipelines shall use a dual pipeline arrangement to deliver two grades of gasoline (PG91 & PG95), ULSD and Jet A-1 refined products to an upgraded and expanded NJBP.
FACTS AND FIGURES
Pipelines to be built:
• YNJ-1: 20”*333,5 Km gasoline pipeline
• YNJ-2: 24”*333,5 Km Diesel & Jet A-1 pipeline
Other Main Facilities:
• 8 valve stations (furnished with RTU's )
• 4 scraper traps
• 430 km of 48-strand ITU-G.652D Single-Mode Fiber Optic Cable (FOC)
• 18 nos. road Thrustboring +1 railroad Thrustboring work
• Supply and install complete solar system at the LDS and install 24VDC Power Panel stations at KM 80.00and KM 170.00
• Cathodic protection
• Provision of communication network infrastructure to facilitate transport of instrument data signals from remote
• LDS and RTUs along the new Yanbu-Jeddah pipeline corridor to OSPAS in Dhahran, and LDS Master
• Processor at EWSP-6.
• Leak defection
Work Quantities:
• Number of Weld Joints:27.776 Joints(14.674.000 inch meters)
• Trench Excavation: 2.015.000 m3 (245.000 m3 Rock + 1.770.000 m3 others)
• ROW Excavation:1.440.000 m3( 620.000 m3 Rock + 820.000 m3 others)
• Padding Sand + Bedding Material : 998.000 m3
• Final Backfill Material:1.057.648 m3
• Marl Material(For Sabkha Section): 226.408 m3
• Concrete: 3,500 m3(Pipeline +Valve Stations)
• Pipe Installation(Block Valve Stations & Scraper Trap Stations : 1,250 Dia inch
• Structural Steel: 220 Tons
• Thrustboring: 19 nos.(18 roads+1 railway)
• FOC : 430 km
• Instruments: 192 nos.
• Instrument Cable : 15.600 mt
• Electrical Distribution Panel + UPS panel : 36 nos.
• Electrical Cable: 18.500 mt
• Over Head Power Line : 6.500 Mt.